Scope 01 / Renovation interior design
A renovation-oriented design package: demolition and partition plans, electrical and plumbing layouts, a material schedule with item codes and supplier references, and a written contractor protocol.
02 / Deliverables
Four documents leave the studio before a wall comes down. Drawings contractors can build from, and a written record of every decision that follows.
Demolition, new partitions, electrical and plumbing routes, ceiling plan, floor finishes and wall elevations. Each sheet is dated and revised the way a contractor reads it on site, not the way a showroom presents it.
Sheets A-01 to A-14
1:50 / rev 3
A decision record, not a mood board. Every item carries a code, the room it belongs to, a supplier reference and a note on which substitutes are approved.
Schedule M-01 to M-36
rev 2
Questions arrive in writing and leave in writing. A request-for-information log, meeting notes and site-visit reports keep the build answerable long after the crew has moved on.
Log RFI-001 onward
open items tracked
Scheduled visits at demolition, first fix and finishing, each with a photo report. Any deviation is recorded and priced before it turns into an argument.
Visits V1 to V6
14-day cycle
03 / Sample pack
A real extract from a two-room apartment in Kyiv: plan, elevation and material schedule, each sheet carrying its own reference, scale and revision.
| Code | Item | Location | Qty |
|---|---|---|---|
| M-01 | Porcelain tile 600 x 600, matte | Bathroom floor | 18 m2 |
| M-04 | Oak veneer 0.6 mm, clear oil | Hall joinery | 9 m2 |
| M-07 | Mineral paint, chalk white | Bedroom walls | 42 m2 |
Any substitution needs a written note in the schedule before ordering. Ask for the full sample set
04 / Timeline
Studio work is outlined. The weeks where we need your sign-off are filled in the signal colour, so no sheet reaches a contractor without a written decision behind it.
See what the drawing set contains05 Evidence
Five line items from one completed two-bedroom renovation in Kyiv. What the drawing set specified on the left, what the contractors built on the right, and a short note on why the line moved.
| Line item | Specified | As built | Note | Change |
|---|---|---|---|---|
Partition build-upA-201 |
100 mm aerated block, plaster to both faces | 75 mm metal stud, double 12.5 mm board | Riser chase occupied the block line. Acoustic rating held at 52 dB with mineral wool. | +₴18,400 |
Wall tileA-311 |
600×1200 porcelain, 3 mm joint, full height | 600×1200 porcelain, 2 mm joint, 2,400 mm | Supplier changed the production batch. Joint width revised across both wet rooms. | ₴0 |
Kitchen joineryJ-104 |
18 mm oak veneer, handleless, 900 mm base | 18 mm oak veneer, handleless, 870 mm base | Duct reroute dropped the ceiling void by 30 mm. Toe kick and plinth detail redrawn. | ₴0 |
Electrical pointsE-402 |
46 points, 8 on dimmer circuits | 52 points, 8 on dimmer circuits | Client added six sockets during first fix. Second fix priced at the schedule rate. | +₴7,900 |
Ceiling finishA-205 |
Continuous plasterboard, 60 mm service void | Continuous plasterboard, 90 mm service void | Duct insulation required the deeper void. Finish and shadow gap unchanged. | ₴0 |
07 / Fees
Three fee lines, each one naming the deliverable and the exact point where our scope stops.
€ 480 fixed
Two site visits, a measured survey, and a written note on what the existing flat allows before any wall comes down.
Ends with the report. No drawings are issued at this stage.
€ 34 per m²
Demolition, partitions, electrical, plumbing, ceiling, floor finishes, elevations, and joinery details where the scope calls for them. The material schedule is issued with item codes, locations, and supplier references.
Minimum area billed is 45 m². Structural calculations are excluded.
€ 55 per hour
Site visits, written responses in the request-for-information log, and meeting notes filed against the drawing revisions in force.
Billed in 15-minute blocks. Site visits are grouped by district to keep travel out of the invoice.
A fee proposal follows a 30-minute call on the flat and the intended works. Request a fee proposal
08 Contact
Send the current plan set and we will return a written scope: what is missing, what a contractor cannot build, and which decisions need to be made before demolition begins.
Prefer to write first? Use the contact page.
Briefly describe the apartment and the stage you are at. We reply within two working days.